Summary
  • Seacom plans to build a land-based submarine cable linking Mombasa, Kenya, to the Democratic Republic of Congo.
  • Submarine cable technology does not require continuous electricity, making it easier to install in remote areas.
  • The project is still on paper and will need to deal with challenges such as rugged terrain, political instability and high logistical costs.

Source: https://tecnoblog.net/noticias/operadora-quer-construir-cabo-submarino-em-terra-firme/



Leave a Reply